ARBITRAZHI NDERKOMBETAR PDF

E DREJTA PROCEDURALE CIVILE NDËRKOMBËTARE(Arbitrazhi ndërkombëtar) Emri,mbiemri dhe nr.i. 16 E drejta e Arbitrazhi dhe e Ndermjetesimit Nderkombetar Tregtar, Suela Mëneri, fq. 17 Hassneh Insurance Co and others v. Steuart. OBT, WIPO, Arbitrazhi Fjalorth OBT- Organizata Botërore e Tregtisë WIPO – Organizata Botërore e Pronësisë Intelektuale IP- Pronësia.

Author: Balabar Maur
Country: Germany
Language: English (Spanish)
Genre: Life
Published (Last): 11 November 2008
Pages: 322
PDF File Size: 13.78 Mb
ePub File Size: 16.27 Mb
ISBN: 408-1-16038-581-1
Downloads: 32356
Price: Free* [*Free Regsitration Required]
Uploader: Daijora

Close and don’t show again Close. Shkrimi dhe publikimi akademik 3 6. Thirrja per konferencen e 4 2. It would also have had to take into account other issues such as land expropriation, utility diversions and separate environmental studies due to the future dam that were additional to the requirements of just this project 4 OBJECTIVE OF SERVICES The objective nderkombettar the sub-consultancy services is to conduct a geological and geotechnical investigation along the nderkombegar corridor affected by the realignment: In rocky formations, the RQD, the joints, the degree of fracturation and weathering shall be determined, in order to classify the material.

Etika profesionale e psikologut ligjor.

All computer results shall be summarised in an understandable table. After removing the layer of topsoil but before excavating the trial pit further a DCP test shall be carried out to a depth of 1. The above list is not exhaustive. Undisturbed core samples shall be covered with paraffin and aluminum paper, ndefkombetar transported by properly trained persons. Data security Created by Evelio Clavel-Rosales. View Ideas submitted by the community.

Areas of soft ground where embankment stability and settlement may be a problem should be identified and proposals planned for their investigation. After excavating the pit to its full depth and identifying all the distinct layers, a disturbed sample of 20 — 50 kg.

Nderkombeetar construction of this dam will result in a lake that would rise to a maximum level of m above datum, resulting in important impacts on the surrounding environment including a section of the proposed Damas Tepelene realignment.

At least one disturbed soil sample shall be extracted from each soil layer, or at every 3 m in homogenous soil. Bachelor in Computer Engineering. Winning candidates for the second cycle of studies.

  HUGO VEZZETTI PASADO Y PRESENTE PDF

Backfilling of pits and trenches shall be carried out as soon a practicable with material replaced at similar depth as encountered. Immediately after their extraction from the borehole all samples of each core-drilling shall be carefully placed in suitable wooden boxes, with indication of the beginning and the end of each sample, the serial number of the box and the total number of boxes for each borehole core-drilling.

International Arbitration Conventions

Zones where natural slopes appear to be unstable and cutting slopes that have suffered instability and landslide or failure of retaining structures, should be closely studied to determine cause, possible remedial measures and to plan the investigation.

Skender Allkja The facsimile numbers of the Parties respectively are as follows: The Sub-consultant shall also prepare interpretative geological profiles on the bridge axes based upon the borehole and trial pit logs. This convention is similar to the New York Convention, as it provides for instance the presumption of enforceability of arbitration agreements and awards.

Bachelor in Electronic Engineering. Term search Jobs Translators Clients Forums. It is usual that retaining structures will be used in the part of the alignment.

The original design for the Damas Tepelene project had recognised the existence of a proposal to construct a dam on the Vosjes River.

OBT, WIPO, Arbitrazhi by Ilda Miftari on Prezi

Refer to Clause 4. From trial pits, at least one disturbed sample shall be taken from each discrete layer. It provides for a procedure before an arbitral tribunal as well nserkombetar a conciliation mechanism. From the studies of the terrain, this geological map will show the limits between the different geological formations, and all the visible phenomena relevant for defining the engineering-geological and hydrogeological problems of the terrain landslides, rock falls etc.

A visual survey of the existing road that lies within or close to the proposed new road corridor shall be carried out noting the carriageway and shoulder width, and the condition of the surfacing in terms of cracking, patching and rutting depth or deformation. Master of Sciences in Information Technology. Review native language verification applications submitted by your peers. Variants for the Preliminary design are shown on Appendix 2 The investigation shall provide all the geological and geotechnical information required to enable an economical and safe design of the project.

  DIE SCHWARZE SPINNE GOTTHELF PDF

This Convention is the most significant one with respect to international commercial arbitration. At this location the tender design route passes at the edge of the Vosjes flood plain at a level as low as 96m above datum.

International Arbitration Conventions

Vote Promote or demote ideas. These will be affected by the construction of the dam. Attention should be paid: Shkrimi dhe publikimi akademik. Another important convention is the European Convention on International Commercial Arbitration which is the most important regional instrument.

It is particularly important to identify arbifrazhi that has been caused by embankment slope instability – lateral creep, lack of shoulder support etc. Contract Programme Appendix 2: The penetration test should start at the surface just below the granular layers of the existing pavement. It concerns arbitration agreements, the arbitral procedure and arbitral awards.

International competition in the field of commercial law and arbitration

Rigid core spacers shall be used to indicate any missing lengths. Photographs of each pit and its walls shall be taken along with a tape-measure and a photographic colour arbktrazhi.

Artificial light shall be used to light up the part of the excavation in shadow so as to reduce light contrasts. A visual description shall be recorded of all the strata encountered including composition, colour, structure, dip, degree of weathering etc. Post Your ideas for ProZ.

Praktika Profesionale 5 2. Values of CBR shall be estimated from the number mm penetration per blow using the recommended formula.